Concrete Contractor — Driveways & Patios that Last
At Allegiant Concrete Construction LLC, we provide high-quality, long-lasting concrete work for homeowners and small businesses across Tomball, Spring, The Woodlands, and surrounding areas. Whether you need a new driveway, a stamped patio, or a slab for a new building—we’ve got you covered.
Driveways & Patios — Clear Scope. Clean Work. Great Results.
Patios: Broom or stamped, non-slip options available
Driveways: New installs & replacements, demo & haul-off included
Reinforcement: #3 rebar ~16" O.C. (project-dependent)
Concrete: Minimum 3,000 psi (we use 3,500 psi)
Control joints: ~12–15 ft.
Drainage: Only if needed (slope; drains when appropriate)
Finish: Clean broom or decorative stamped concrete
Cleanup: Tidy jobsite and walkthrough
Why Choose Us
Why Homeowners Choose Allegiant
Local expertise in North Houston soils & weather
Clear, itemized proposals (no vague line items)
On-time, on-budget crews focused on driveways & patios
Great communication from quote to final walkthrough
Warranty on craftmanship
Our Process
Quick call & estimate window
Site check (as needed) — measurements, slope, access
Old concrete demolition (if needed) - haul off included
Forms & rebar — ready to pour
Pour & finish — joints & broom finish
Cleanup & walkthrough — care tips and warranty
Concrete Patios
Build a beautiful and functional outdoor patio tailored to your lifestyle. Smooth, broom, or decorative stamped finishes available.
Concrete Driveways
We replace cracked, damaged, or aging driveways with steel-reinforced concrete built to last in Texas weather. Choose from broom finish or stamped textures.
Stamped Concrete
Upgrade your space with stamped concrete that mimics natural stone, brick, or tile—at a fraction of the cost. Perfect for patios, walkways, and pool decks.
Frecuently aSKed questions
How much does a driveway cost?
Pricing depends on size, access, base corrections, finish, and demo/haul-off. We confirm after quick measurements.
When can I park on new concrete?
Foot traffic in 24–48 hours; vehicles typically after ~5–7 days depending on mix and temperature.
What mix do you use?
Minimum 3000 PSI; we typically pour 3500 PSI for durability.
Do you handle demo & haul-off?
Yes, including base corrections and drainage if needed.
Warranty & payment schedule?
1-year workmanship warranty; simple milestone-based payments.